Smart railway system

The main objective of the Ferro Port System II is the development and implementation of an advanced innovative smart system to automate railway operations and management in the port, and which is fully connected with the general railway network. Enabling the exchange of information across the multi-modal logistics platform will help to make the port more efficient, accessible and secure. It will also save time, lower costs and promote rail transport as a sustainable means of transport.

  • Project title:
    FPSII. Deployment of advanced innovative solutions to improve the management of rail traffic in the Core Network
  • Acronym:
    FPSII
  • Number:
    2016-ES-TM-0058-S
  • Program:
    CEF. Announcement 2016
  • Priority:
    RIS (pilot study)
  • Start date:
    01/09/2017
  • End date:
    31/12/2021
  • Budget APS:
    2.351.167 €
  • % de financing:
    50%

Subscribe to the newsletter of the Port Authority of Seville

Autoridad Portuaria de Sevilla
Avenida de Moliní, 6 41012 Sevilla (España)
T +34 954 24 73 00
F +34 954 24 73 43
@ This email address is being protected from spambots. You need JavaScript enabled to view it.